Core site · Commercial

Steel Building Cost Calculator — tonnage and FOB estimate from your dimensions

Enter span, length, eave height and crane capacity and the calculator returns a steel-weight range and an FOB price band, using the published kg/m² and $/m² bands from the November 2026 price guide. It is an estimating tool with its workings shown — the quotation, from your drawings, is the number you can sign against.

Cutaway of a steel portal-frame warehouse — mezzanine, racking and dock doors inside
DESIGN VISUALISATION
Key facts
Method
Area × kg/m² band × scope band
Bands dated
November 2026
Output
Tonnage range + FOB band
Next step
Quotation from drawings

Method: floor area × the kg/m² band your span, eave and crane imply (clear-span warehouses at 6–12 m eave run 26–32 kg/m² — Laotie price guide, Nov 2026), priced on the frame bands from the clear-span cost guide and the envelope band $60–90/m².

Estimate — 1,440 m² building

Steel weight
37–46 t (26–32 kg/m²)
Frame only — FOB China
$43,200–$64,800
Complete envelope — FOB China
$86,400–$129,600

Planning estimate with its workings shown — not a quotation. Freight, duty and installation are additional. Your building prices exactly from drawings.

How the estimate works

Clear-span warehouses at 6–12 m eave run 26–32 kg/m²; crane buildings run heavier. The calculator picks the band your inputs imply, multiplies by area for tonnage, and prices frame and envelope scopes separately — because the scope, not the arithmetic, is where estimates go wrong. The worked-example guide prices a 5,000 m² warehouse line by line on the same method.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does an estimate include?

A tonnage range and an FOB price band for the frame and envelope scopes, worked from the published kg/m² and $/m² bands. An estimate is a planning figure — the quotation from your drawings is the number you can sign against.

Technical RFQ — request a quotation

From this page: Steel Building Cost Calculator — tonnage and FOB estimate from your dimensions. Attach your drawings or BOQ and state the specification basis: design code and load basis (SBC 301/306 for Saudi Arabia; wind, snow and crane loads), steel grades, cladding scope, destination port and your Incoterms (EXW / FOB / CIF). Saudi projects are priced with the SABER conformity route in view, and third-party inspection (SGS / Bureau Veritas) can be written into the quotation at agreed hold points.

WhatsApp instead