Building-type hubs · Transactional

Steel Structure Hotel

High-rise hotel building with steel frame and regular window grid
DESIGN VISUALISATION

Quick answer

Multi-storey steel frames for hotels compete on programme speed: floors cycle fast and the façade follows immediately. Fire rating and acoustic floor build-ups are part of the scope conversation. FOB pricing (November 2026): priced per project; façade package priced with frame (Laotie price guide, Nov 2026). Freight, duty and installation are additional.

Where this building earns its money

Typical uses: business hotels; serviced apartments; resort buildings; staff accommodation towers.

  • Business hotels
  • Serviced apartments
  • Resort buildings
  • Staff accommodation towers

Specification & options

The standard specification is engineered per project — design code, loads and grades are named on the quotation. For this building the engineering starts from multi-storey frame, eave high-rise, and crane provision: none. The options buyers most often price:

  • Composite floor decks
  • Bathroom pod interface
  • Façade bracket systems
  • Fire-rated assemblies

Price this building for your port

Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.

How the price is built

The hotel price is built from this building's own band — priced per project; façade package priced with frame (Laotie price guide, Nov 2026; Akoetech export price guide, Q2 2026). Inside the band, the levers are the ones in the facts above: multi-storey frame, eave high-rise and a steel weight of Project-specific. The price guides work the method in full, with worked examples; the calculator then prices your dimensions on the same bands.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel hotel include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page