Building-type hubs · Transactional
Steel Structure Cold Storage

Quick answer
The frame is the easy half of a cold store; the buyer is really buying temperature performance. PIR or mineral-wool panel thickness, vapour control and door specification decide the quotation. FOB pricing (November 2026): $30–48/m² frame; panel scope dominates (Laotie price guide, Nov 2026). Freight, duty and installation are additional.
Where this building earns its money
Typical uses: food & beverage cold chain; pharmaceutical storage; fish & meat processing; date & produce packing.
- Food & beverage cold chain
- Pharmaceutical storage
- Fish & meat processing
- Date & produce packing
Specification & options
The standard specification is engineered per project — design code, loads and grades are named on the quotation. For this building the engineering starts from 18–40 m, eave 8–14 m (high-bay cold stores higher), and crane provision: none. The options buyers most often price:
- PIR panels 100–200 mm
- Rapid-roll insulated doors
- Refrigeration plant slab interface
- Blast-freezer cells
Price this building for your port
Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.
How the price is built
The cold storage price is built from this building's own band — $30–48/m² frame; panel scope dominates (Laotie price guide, Nov 2026; Akoetech export price guide, Q2 2026). Inside the band, the levers are the ones in the facts above: 18–40 m, eave 8–14 m (high-bay cold stores higher) and a steel weight of 28–40 kg/m². The price guides work the method in full, with worked examples; the calculator then prices your dimensions on the same bands.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a cold storage building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
This hub — every page under it
Type × market
Project cases
Guides & how-to
Continue — linked from this page