Guides & how-to · Question / AEO
How to reduce the cost of a cold storage building without cutting safety

Quick answer
Reduce a cold store's cost at the temperature map: do not insulate a chill room to freezer specification — panel core and thickness per room. Then door count (every door is a machine and a leak), floor scope, and frame levers behind them (multi-span 15–30%, bay spacing 3–7%; Promisteel, 2026). The frame is not where cold stores overspend.
In detail
Panel specification discipline cuts both ways: under-insulating a freezer is a thirty-year energy bill bought to save a one-week panel bill.
Refrigeration is outside the building price — but door and panel decisions set its running cost, which is where cold stores are really paid for.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a cold storage building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page