On a like-for-like FOB China basis, a standard steel building frame costs $25–45 per m², a complete envelope $60–90 per m², and a turnkey package $90–150 per m² (Laotie price guide, updated November 2026). Freight, duty and installation are additional everywhere. Any single figure quoted without its scope is not comparable — this guide exists to make scopes comparable.

The numbers, with their scopes

Published ranges disagree because scope differs, not because someone is lying: one Chinese cost guide puts frame-only FOB at $40–120/m² and fully built at $250–700/m² (JX Steel Structure, 2026), with the frame at 30–45% of finished cost. Both can be true of different buildings.

The drivers, in order: span, crane capacity, eave height, steel grade (Q235B vs Q355B), coating system, and panel type. Prices on this page are reviewed against our own quotations; validity on any live quotation is 15 days.

ScopeFOB China bandWhat it includes
Frame only$25–45/m²Primary + secondary steel, connections, anchor bolts
Complete envelope$60–90/m²Frame + roof & wall cladding, trims, fixings
Turnkey package$90–150/m²Envelope + doors, ventilation, accessories package

From guide to quotation

This guide answers the general question — what does a steel structure cost per square metre in 2026? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.