Moving from no crane to a crane building typically moves the frame band from $26–42/m² to $36–55/m² FOB. In tonnage terms, stepping crane capacity from 5 t to 32 t adds about 25–40 tonnes of steel — roughly $20,000–35,000 on an 80 m building (Promisteel PEB cost guide, 2026) — before the crane machine itself, usually a separate purchase.
The numbers, with their scopes
Duty class matters as much as capacity: a 10 t crane lifting all day needs heavier runway steel than one lifting twice a week.
Price the no-crane and crane versions side by side if the need is uncertain — the delta is a design output, not a guess.
| Scope | FOB China band | What it includes |
|---|---|---|
| No crane → 5 t | Band $26–42 → $36–55/m² | Runway + brackets |
| 5 t → 32 t | +25–40 t steel | ≈ $20,000–35,000 on 80 m building |
From guide to quotation
This guide answers the general question — how much does an overhead crane add to a steel building's price? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.