Building-type hubs · Transactional
Steel Structure Factory & Workshop

Quick answer
Buyers search factory, workshop and industrial building interchangeably — this hub owns all three. The crane runway is the defining item: capacity, duty class and runway beam design move the tonnage more than any other choice. FOB pricing (November 2026): $36–55/m² frame; $60–95/m² complete package (Laotie price guide, Nov 2026). Freight, duty and installation are additional.
Where this building earns its money
Typical uses: manufacturing plants; workshops & fabrication shops; food & light industry; maintenance depots.
- Manufacturing plants
- Workshops & fabrication shops
- Food & light industry
- Maintenance depots
Specification & options
The standard specification is engineered per project — design code, loads and grades are named on the quotation. For this building the engineering starts from 18–36 m per bay, multi-bay, eave 8–15 m, and crane provision: 5–50 t overhead crane runway. The options buyers most often price:
- 5–50 t crane runway beams
- Machine foundations interface
- Office mezzanine block
- High-bay lighting rails
Price this building for your port
Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.
How the price is built
The factory price is built from this building's own band — $36–55/m² frame; $60–95/m² complete package (Laotie price guide, Nov 2026; Akoetech export price guide, Q2 2026). Inside the band, the levers are the ones in the facts above: 18–36 m per bay, multi-bay, eave 8–15 m and a steel weight of 35–55 kg/m² with crane. The price guides work the method in full, with worked examples; the calculator then prices your dimensions on the same bands.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel factory include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
This hub — every page under it
Type × market
Project cases
Guides & how-to
Continue — linked from this page