Building-type hubs · Transactional

Steel Structure Factory & Workshop

Steel factory building with crane-ready portal frames and cladding
DESIGN VISUALISATION

Quick answer

Buyers search factory, workshop and industrial building interchangeably — this hub owns all three. The crane runway is the defining item: capacity, duty class and runway beam design move the tonnage more than any other choice. FOB pricing (November 2026): $36–55/m² frame; $60–95/m² complete package (Laotie price guide, Nov 2026). Freight, duty and installation are additional.

Where this building earns its money

Typical uses: manufacturing plants; workshops & fabrication shops; food & light industry; maintenance depots.

  • Manufacturing plants
  • Workshops & fabrication shops
  • Food & light industry
  • Maintenance depots

Specification & options

The standard specification is engineered per project — design code, loads and grades are named on the quotation. For this building the engineering starts from 18–36 m per bay, multi-bay, eave 8–15 m, and crane provision: 5–50 t overhead crane runway. The options buyers most often price:

  • 5–50 t crane runway beams
  • Machine foundations interface
  • Office mezzanine block
  • High-bay lighting rails

Price this building for your port

Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.

How the price is built

The factory price is built from this building's own band — $36–55/m² frame; $60–95/m² complete package (Laotie price guide, Nov 2026; Akoetech export price guide, Q2 2026). Inside the band, the levers are the ones in the facts above: 18–36 m per bay, multi-bay, eave 8–15 m and a steel weight of 35–55 kg/m² with crane. The price guides work the method in full, with worked examples; the calculator then prices your dimensions on the same bands.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel factory include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

This hub — every page under it

Continue — linked from this page