How is a steel factory shipped from China — and in how many containers?

Steel building — a steel factory
DESIGN VISUALISATION

Quick answer

A steel factory ships like a warehouse — bundled members in 40 ft containers, $3,500–5,500 per container to the Middle East (Promisteel, 2026) — with heavier lifts inside: runway beams and crane girders are the long, heavy bundles that set the packing plan. The crane machine itself ships separately, usually in the crane maker's own packing.

In detail

Sea times follow the route: 1–2 weeks to Southeast Asia, 2–3 to the Middle East, 3–5 to Africa (JA Steel timeline).

Runway rails and crane parts are matched to the runway bundles by identity — the erection crew should never sort steel by eye.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel factory include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.