Building-type hubs · Transactional

Steel Car Park — Multi-Storey Frame

Multi-storey steel car park frame with open decks
DESIGN VISUALISATION

Quick answer

Steel-deck multi-storey parking: fast frames, long deck spans, and a per-space cost conversation. Different intent from parking shade — this is the frame product. FOB pricing (November 2026): priced per project; deck & ramp package (Laotie price guide, Nov 2026). Freight, duty and installation are additional.

Where this building earns its money

Typical uses: hospital & mall parking; park-and-ride; airport parking; office parking decks.

  • Hospital & mall parking
  • Park-and-ride
  • Airport parking
  • Office parking decks

Specification & options

The standard specification is engineered per project — design code, loads and grades are named on the quotation. For this building the engineering starts from 15–16 m deck grids, eave multi-storey, and crane provision: none. The options buyers most often price:

  • Composite deck floors
  • Speed ramps
  • Façade screening
  • PV canopy top deck

Price this building for your port

Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.

How the price is built

The car park price is built from this building's own band — priced per project; deck & ramp package (Laotie price guide, Nov 2026; Akoetech export price guide, Q2 2026). Inside the band, the levers are the ones in the facts above: 15–16 m deck grids, eave multi-storey and a steel weight of Project-specific. The price guides work the method in full, with worked examples; the calculator then prices your dimensions on the same bands.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel car park include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page