Core site · RFQ

Request a Technical Quotation — drawings, BOQ and specification in one RFQ

Design coordination — drawings and the steel model on the engineer's desk
DESIGN VISUALISATION

Quick answer

A priced quotation is worked from your documents: drawings or BOQ, the specification and load basis (design code, wind and crane loads, steel grades), dimensions, cladding scope, destination port and Incoterms. The reply is an itemised quotation — design basis, scope lines, tonnage, kg/m², validity and exclusions — or one specific question about the missing input.

Compose the brief from the specification you have

Build your project brief

Project brief — HANJI Steel Structures
I am: Owner / developer
Building: Warehouse
Market: Saudi Arabia
Size: 60 m × 24 m (1,440 m²), eave 9 m
Crane: No crane
Cladding: Sandwich panels
Please quote FOB and CIF, with tonnage and kg/m² stated.

Composed on this page — nothing is submitted anywhere until you send it. For the formal RFQ — drawings, BOQ and load basis attached — use the technical quotation form on this page.

What happens after you send it

Your RFQ is read by the export engineering desk, checked against the input list, and either priced or answered with the one missing question. Saudi projects are checked against the SBC 301/306 design basis and the SABER document route at this stage, not at shipment. The after-you-enquire page walks through the sequence; the RFQ checklist shows the full input list if you want to send everything at once.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does a quotation include?

An itemised quotation states its design basis, scope lines (frame, envelope or turnkey), tonnage and kg/m², its price basis (FOB, CIF or installed) and its validity — the FOB vs CIF guide explains the scope ladder.

This hub — every page under it

Continue — linked from this page