Building-type hubs · Transactional
Steel Labour Camp & Worker Accommodation

Quick answer
High Gulf intent: contractors housing project workforces need fast, repeatable accommodation that passes SBC 801 worker-accommodation requirements. Sold per block layout, not per square metre alone. FOB pricing (November 2026): $25–40/m² structure-only; per-unit pricing on layout (Laotie price guide, Nov 2026). Freight, duty and installation are additional.
Where this building earns its money
Typical uses: construction workforce camps; remote site accommodation; staff housing compounds; temporary facilities.
- Construction workforce camps
- Remote site accommodation
- Staff housing compounds
- Temporary facilities
Specification & options
The standard specification is engineered per project — design code, loads and grades are named on the quotation. For this building the engineering starts from light-gauge / modular units, eave single & two-storey blocks, and crane provision: none. The options buyers most often price:
- Dormitory blocks by bed count
- Mess hall & kitchen blocks
- Prayer & recreation rooms
- Ablution & laundry units
Price this building for your port
Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.
How the price is built
The labour camp price is built from this building's own band — $25–40/m² structure-only; per-unit pricing on layout (Laotie price guide, Nov 2026; Akoetech export price guide, Q2 2026). Inside the band, the levers are the ones in the facts above: light-gauge / modular units, eave single & two-storey blocks and a steel weight of Structure-only basis. The price guides work the method in full, with worked examples; the calculator then prices your dimensions on the same bands.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel labour camp include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
This hub — every page under it
Type × market
Project cases
Guides & how-to
Continue — linked from this page