How to compare quotations for a labour camp without being misled

Quick answer
Compare labour camp quotations per bed, not per block: beds per room, ablution and mess ratios against SBC 801, block specification, and phasing scope — two camps with identical block counts house different workforces. Then the standard fingerprints: what is excluded, what the document pack holds, and whether later phases price at the same unit basis.
In detail
A cheaper camp is often a smaller camp: fewer beds per block or thinner facility ratios, invisible until the workforce arrives.
Compare delivered scope per phase — a camp priced whole but shipped late is a mobilisation problem, not a saving.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a labour camp include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.