Core site · Commercial

Payment & Terms — deposit, milestones and documents

Bundled steel members loaded and ready for dispatch
DESIGN VISUALISATION

Quick answer

Payment follows verifiable events: a T/T deposit against the signed contract and approved drawings starts fabrication; the balance falls due before shipment, after inspection; larger orders can run on an irrevocable L/C at sight. Quotation validity is 15 days, stated on the quote. No stage is tied to a date alone.

Why milestones, not dates

A deposit against drawings, a balance against an inspection and a bill of lading protect both sides at the moments risk actually changes hands. The payment-terms guide explains the normal export pattern and what each document proves.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

Continue — linked from this page