Price & cost guides · Price / cost intent

Price Validity & the Steel Index

Steel building — the building behind the price band
DESIGN VISUALISATION

Quick answer

Steel is a commodity-priced input, so export quotations carry short validity — 15 days is the working standard on this site, stated on the price guide itself (Laotie's guide is reviewed monthly). A quotation without a validity date is either padded or careless; tender buyers should ask for the validity — and the index basis behind it — in writing.

The numbers, with their scopes

Between quotation and deposit, section and plate prices can move enough to matter on a 200-tonne building — the validity clause protects both sides.

Revalidation after expiry is a re-price of the steel lines, not a new quotation.

ScopeFOB China bandWhat it includes
Standard validity15 daysOn quotations
Review cycleMonthlyPrice guide pages

From guide to quotation

This guide answers the general question — how long is a steel building quotation valid? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page