Price Validity & the Steel Index

Quick answer
Steel is a commodity-priced input, so export quotations carry short validity — 15 days is the working standard on this site, stated on the price guide itself (Laotie's guide is reviewed monthly). A quotation without a validity date is either padded or careless; tender buyers should ask for the validity — and the index basis behind it — in writing.
The numbers, with their scopes
Between quotation and deposit, section and plate prices can move enough to matter on a 200-tonne building — the validity clause protects both sides.
Revalidation after expiry is a re-price of the steel lines, not a new quotation.
| Scope | FOB China band | What it includes |
|---|---|---|
| Standard validity | 15 days | On quotations |
| Review cycle | Monthly | Price guide pages |
From guide to quotation
This guide answers the general question — how long is a steel building quotation valid? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.