Price & cost guides · Price / cost intent

Aircraft Hangar Cost per Square Metre

Steel building — the building behind the price band
DESIGN VISUALISATION

Quick answer

Hangar frames price at $48–65/m² FOB in the space-frame band (Laotie Saudi page, 2026) — before the door system, which is a major separate line. At 30–90 m spans the frame is heavier (45–70 kg/m²) and the door head height, not the floor area, drives the engineering.

The numbers, with their scopes

Compare hangar quotes on door specification first: sliding, vertical-lift and fabric doors differ widely in price and in the steel they hang from.

The 60×40×9 m reference design page works this size in full.

ScopeFOB China bandWhat it includes
Frame (space frame)$48–65/m²Roof structure + columns
Door systemPer designSliding / vertical-lift / fabric
EnvelopePer designCladding, insulation, liners

From guide to quotation

This guide answers the general question — how much does a steel aircraft hangar cost per square metre? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page