Guides & how-to · Question / AEO

How much does a labour camp cost per square metre in 2026?

Steel building — a labour camp
DESIGN VISUALISATION

Quick answer

A labour camp prices from the light-gauge basis: $25–40/m² structure-only FOB (Laotie Saudi page, 2026). But camps are sold per block layout, not per square metre alone — beds per room, ablution ratios and mess capacity under SBC 801 decide the real figure, so a $/m² comparison between camp suppliers compares layouts, not buildings.

In detail

Ask every camp bidder to price the same bed count and the same SBC 801 facility ratios; a cheaper camp is often a smaller camp wearing the same block count.

The labour camp hub prices dormitory, mess and ablution blocks by layout; camps are configured from workforce numbers, not dimensioned like warehouses.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a labour camp include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.