Quick answer
A labour camp has no span question to price: blocks are light-gauge units of room width, repeated — the structure is a grid by birth. The camp equivalent of the span decision is standardisation itself: standard blocks repeat engineering and production, and every bespoke block re-opens both. Spend the design effort on layout and SBC 801 ratios instead.
In detail
Where a camp needs one wide space — the mess hall — it is framed as a small portal building of its own; the dormitory grid is untouched.
This is why camp pricing is per layout: repetition, not span, is the cost engine.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a labour camp include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.