Guides & how-to · Question / AEO

How is a labour camp shipped from China — and in how many containers?

Steel building — a labour camp
DESIGN VISUALISATION

Quick answer

A labour camp ships as flat-packed light-gauge bundles — the densest cargo on this site, because blocks repeat and members nest. Containers carry whole block kits in erection order, phased to workforce mobilisation: dormitories first, mess and ablution following. Freight per bed falls with every repeated block, which is the camp's whole cost logic in one sentence.

In detail

Middle East container freight runs $3,500–5,500 per container (Promisteel, 2026) — phase the shipments and the freight follows the workforce curve, not the production curve.

Fittings, doors and ablution units pack inside their own block's container; a camp that arrives complete per block erects without a parts hunt.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a labour camp include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page