Labour Camp in Egypt

Two-storey steel worker accommodation blocks and mess hall in a desert compound
DESIGN VISUALISATION

Quick answer

A steel labour camp for Egypt prices from the type band — $25–40/m² structure-only (November 2026) — landed through Sokhna (ocean freight China→Africa typically 3–5 weeks). Design basis: Egyptian steel code; local consultant approvals. Duty confirmed per HS code with your broker.

Why Egypt changes the labour camp specification

Climate: Swelling clays are a known ground condition in New Cairo, Madinat Nasr and Al Shorouk — foundation design must be told the soil report, not assumed.

Gulf logistics investment is spilling into Egypt — DP World at Sokhna and AD Ports at East Port Said — and warehouse/workshop demand follows it.

The building, as specified on the hub

High Gulf intent: contractors housing project workforces need fast, repeatable accommodation that passes SBC 801 worker-accommodation requirements. Sold per block layout, not per square metre alone.

  • Dormitory blocks by bed count
  • Mess hall & kitchen blocks
  • Prayer & recreation rooms
  • Ablution & laundry units

Price this building for your port

Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.

Delivery & documents

Route: fabrication in Cangzhou → container packing in erection sequence → Sokhna. Document pack: drawings and calculations to the code above, mill certificates (EN 10204 3.1), welding and inspection records, packing list — plus the destination conformity route described on the Egypt market page.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

Do you ship to Egypt?

Yes — Sokhna: ocean freight China→Africa typically 3–5 weeks; Alexandria: ocean freight China→Africa typically 3–5 weeks. Duty confirmed per HS code with your broker.

What does the price for a steel labour camp include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.