How to reduce the cost of a labour camp without cutting safety

Quick answer
Reduce a labour camp's cost by repeating: standard blocks, one layout engineered once and produced at pace, phased shipping matched to mobilisation so freight and site costs follow the workforce curve. Then specification honesty — SBC 801 ratios met exactly, not gilded. The bespoke block is the camp's cost leak: every unique layout re-opens engineering and slows the line.
In detail
Beds per room is a code-and-comfort decision with a hard floor at SBC 801 — savings below it are not savings, they are rejections at approval.
Phase pricing should be agreed whole-camp at order: later phases at production pace are cheaper than later phases re-quoted as new orders.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a labour camp include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page