What foundation does a labour camp need?

Quick answer
A labour camp's foundations are the lightest on this site: light-gauge blocks sit on slab or strip footings sized from issued reactions, repeated identically under every block. The engineering is in the repetition — one footing design, surveyed setting-out, and services trenches planned with the grid. Ground conditions rule: filled or swelling soils change the slab design, not the block.
In detail
Phased camps pour foundations one phase ahead of the steel — the cheapest programme insurance on a mobilisation deadline.
Mess halls and wide camp buildings sit on portal-frame footings designed as a small warehouse; the camp set keeps the two systems separate.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a labour camp include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.