Type × market · Transactional + local
Labour Camp in Vietnam

Quick answer
A steel labour camp for Vietnam prices from the type band — $25–40/m² structure-only (November 2026) — landed through Ho Chi Minh City (Cat Lai) / Hai Phong (ocean freight China→SE Asia typically 1–2 weeks). Design basis: Vietnamese standards; AISC/Eurocode design accepted. Duty confirmed per HS code; anti-dumping may apply.
Why Vietnam changes the labour camp specification
Climate: Monsoon rain, high humidity and coastal corrosion; typhoon exposure in the centre and north.
Strong local fabrication (large domestic factories) means the export kit wins on engineering depth, crane buildings and lead time, not headline price.
The building, as specified on the hub
High Gulf intent: contractors housing project workforces need fast, repeatable accommodation that passes SBC 801 worker-accommodation requirements. Sold per block layout, not per square metre alone.
- Dormitory blocks by bed count
- Mess hall & kitchen blocks
- Prayer & recreation rooms
- Ablution & laundry units
Price this building for your port
Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.
Delivery & documents
Route: fabrication in Cangzhou → container packing in erection sequence → Ho Chi Minh City (Cat Lai) / Hai Phong. Document pack: drawings and calculations to the code above, mill certificates (EN 10204 3.1), welding and inspection records, packing list — plus the destination conformity route described on the Vietnam market page.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Do you ship to Vietnam?
Yes — Ho Chi Minh City (Cat Lai) / Hai Phong: ocean freight China→SE Asia typically 1–2 weeks. Duty confirmed per HS code; anti-dumping may apply.
What does the price for a steel labour camp include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page