Labour Camp in Philippines

Quick answer
A steel labour camp for Philippines prices from the type band — $25–40/m² structure-only (November 2026) — landed through Manila / Batangas (ocean freight China→SE Asia typically 1–2 weeks). Design basis: NSCP 2015 (AISC 360-10 basis); typhoon wind design. Duty confirmed per HS code with your broker.
Why Philippines changes the labour camp specification
Climate: Typhoon wind loads and coastal corrosion govern design and coating.
A dedicated supplier page for this market quotes FOB $25–65/m² with 15–30-day lead times (Laotie Philippines page, read Nov 2026) — the competitive bar this market expects.
The building, as specified on the hub
High Gulf intent: contractors housing project workforces need fast, repeatable accommodation that passes SBC 801 worker-accommodation requirements. Sold per block layout, not per square metre alone.
- Dormitory blocks by bed count
- Mess hall & kitchen blocks
- Prayer & recreation rooms
- Ablution & laundry units
Price this building for your port
Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.
Delivery & documents
Route: fabrication in Cangzhou → container packing in erection sequence → Manila / Batangas. Document pack: drawings and calculations to the code above, mill certificates (EN 10204 3.1), welding and inspection records, packing list — plus the destination conformity route described on the Philippines market page.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Do you ship to Philippines?
Yes — Manila / Batangas: ocean freight China→SE Asia typically 1–2 weeks. Duty confirmed per HS code with your broker.
What does the price for a steel labour camp include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.