What information is needed for a labour camp quotation?

Quick answer
A labour camp quotation is a layout, not a dimension set: beds required, beds per room, mess and ablution capacity against SBC 801 ratios, block phasing, and destination (HF Steel quotation guides). Send the workforce number and the mobilisation date — the camp is configured from those two figures, and priced per block layout from there.
In detail
Prayer, recreation and laundry provision are layout inputs with code ratios behind them, not afterthoughts — include the client's camp standard if one exists.
A camp brief in beds and dates prices in one pass; a camp brief in square metres prices in three.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a labour camp include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.