Type × market · Transactional + local
Labour Camp in UAE

Quick answer
A steel labour camp for UAE prices from the type band — $25–40/m² structure-only (November 2026) — landed through Jebel Ali (Dubai) (ocean freight China→Middle East typically 2–3 weeks). Design basis: Local authority approvals; ESMA conformity. Duty typically 5%; VAT 5%.
Why UAE changes the labour camp specification
Climate: Coastal humidity and salt spray around Dubai, Abu Dhabi and Sharjah drive coating choice; inland heat drives panel specification.
The second Gulf market and a re-export base for the region. Local fabrication competes hard, so the export offer is factory-direct FOB/CIF pricing and specification — not a claim to be a local fabricator.
The building, as specified on the hub
High Gulf intent: contractors housing project workforces need fast, repeatable accommodation that passes SBC 801 worker-accommodation requirements. Sold per block layout, not per square metre alone.
- Dormitory blocks by bed count
- Mess hall & kitchen blocks
- Prayer & recreation rooms
- Ablution & laundry units
Price this building for your port
Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.
Delivery & documents
Route: fabrication in Cangzhou → container packing in erection sequence → Jebel Ali (Dubai). Document pack: drawings and calculations to the code above, mill certificates (EN 10204 3.1), welding and inspection records, packing list — plus the destination conformity route described on the UAE market page.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Do you ship to UAE?
Yes — Jebel Ali (Dubai): ocean freight China→Middle East typically 2–3 weeks. Duty typically 5%; VAT 5%.
What does the price for a steel labour camp include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page