Guides & how-to · Question / AEO
How long does it take to build a labour camp?

Quick answer
A labour camp is the fastest building on this site to repeat: blocks are configured from standard light-gauge units, so after the first block's engineering (inside the standard 1–3 weeks), fabrication repeats at production pace and later phases ship while earlier ones erect. Sea freight runs by region — 2–3 weeks to the Gulf.
In detail
Phasing is the camp buyer's real schedule tool: dormitory blocks first, mess and ablution in the same or following shipment, matched to workforce mobilisation dates.
SBC 801 layout approval sits with the buyer's Saudi project route — start it at quotation stage so approval, not fabrication, never becomes the critical path.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a labour camp include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.