Guides & how-to · Question / AEO
What information is needed for a steel factory quotation?

Quick answer
A steel factory quotation turns on the crane: capacity and duty class first, then bay layout and span, eave height, destination, and cladding scope (HF Steel quotation guides). A factory brief without the crane line prices a warehouse with thicker paint — the runway, brackets and column stiffness are designed from the crane data sheet, not from the floor plan.
In detail
Process loads — machine foundations, mezzanine offices, high-bay lighting — belong in the first brief; each maps to a priced line.
If the crane is future rather than day-one, say so: designing columns for a later runway is cheap now and expensive later.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel factory include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page