Quick answer

Reduce a factory's cost at the crane first: right-size capacity and, above all, duty class — stepping from 5 t to 32 t adds roughly 25–40 tonnes of steel, about $20,000–35,000 on an 80 m building (Promisteel, 2026). Then multi-bay layouts, bay-spacing optimisation (3–7%), and eave fixed to process height. The crane decision is the budget; the rest is refinement.

In detail

If the heavy lift happens twice a year, price a mobile crane or a split building against the fixed runway — the comparison is one drawing exercise.

Future-crane provision (columns and footings ready, runway later) buys the option at a fraction of the day-one cost.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel factory include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.