Guides & how-to · Question / AEO

How to choose a manufacturer in China for a steel factory

Steel building — a steel factory
DESIGN VISUALISATION

Quick answer

For a crane factory, add one test to the standard evidence — verified status, factory video, inspection openness (supplier-guide research, 2026): ask how the runway is designed. A real crane-building manufacturer answers with duty class, wheel loads and surge, and asks for your crane data sheet. A trader answers with a tonnage and a discount.

In detail

Crane buildings separate factories from assemblers: runway fatigue design and column stiffness are engineering a catalogue cannot fake for long.

Check the document pack — WPS/PQR, mill certificates to EN 10204 3.1, NDT records — against a previous crane project, not a warehouse one.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel factory include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page