Quick answer
A steel factory for Vietnam prices from the type band — $36–55/m² frame (November 2026) — landed through Ho Chi Minh City (Cat Lai) / Hai Phong (ocean freight China→SE Asia typically 1–2 weeks). Design basis: Vietnamese standards; AISC/Eurocode design accepted. Duty confirmed per HS code; anti-dumping may apply.
Why Vietnam changes the factory specification
Climate: Monsoon rain, high humidity and coastal corrosion; typhoon exposure in the centre and north.
Strong local fabrication (large domestic factories) means the export kit wins on engineering depth, crane buildings and lead time, not headline price.
The building, as specified on the hub
Buyers search factory, workshop and industrial building interchangeably — this hub owns all three. The crane runway is the defining item: capacity, duty class and runway beam design move the tonnage more than any other choice.
- 5–50 t crane runway beams
- Machine foundations interface
- Office mezzanine block
- High-bay lighting rails
Price this building for your port
Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.
Delivery & documents
Route: fabrication in Cangzhou → container packing in erection sequence → Ho Chi Minh City (Cat Lai) / Hai Phong. Document pack: drawings and calculations to the code above, mill certificates (EN 10204 3.1), welding and inspection records, packing list — plus the destination conformity route described on the Vietnam market page.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Do you ship to Vietnam?
Yes — Ho Chi Minh City (Cat Lai) / Hai Phong: ocean freight China→SE Asia typically 1–2 weeks. Duty confirmed per HS code; anti-dumping may apply.
What does the price for a steel factory include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.