What foundation does a steel factory need?

Quick answer
A steel factory's foundations carry two structures: the building, from our issued column reactions, and the crane's dynamic loads through the runway columns. Machine foundations are a third, separate design — process equipment sits on its own pads, isolated from the frame footings. One concrete package, three designs: the brief should say so.
In detail
Crane surge and end-stop loads belong in the first foundation brief — they arrive with the crane data sheet, not with the building drawings.
Future crane upgrades are a foundation decision made once: footings sized for the day-one crane rarely accept the year-five one.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel factory include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.