Quick answer

For a crane factory, grade follows the crane: Q235B serves the envelope frames, while Q355B earns its place in runway girders and heavily loaded columns, where 355 MPa yield buys stiffness and fatigue life in a workable section size. Impact sub-grades matter under dynamic crane loading — name them in the specification, not at the inspection.

In detail

The grade decision is per member: a factory quotation that prices one grade throughout has simplified the engineering, not optimised it.

Mill certificates (EN 10204 3.1) tie every batch to its heat number — the runway steel's certificates are the ones your inspector will ask for first.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel factory include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.