A steel factory — clear span vs multi-span: which is cheaper?

Quick answer
For a factory, the span question is really a crane question: a crane runway needs its column lines anyway, so multi-bay layouts lose little and save the usual 15–30% against clear span (Promisteel, 2026). Clear span earns its cost where a process line must reconfigure freely. Price both — with the same crane, duty class and runway in each.
In detail
Multi-bay factories are the industry default for a reason: bays of 18–36 m repeat frames, runways and services economically.
Where one bay must be column-free — a wide assembly area — a hybrid (one clear bay, the rest gridded) prices the exception only.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel factory include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.