Design checklist for a steel factory — span, eave, crane, panels, doors

Quick answer
The factory design checklist is crane-led: capacity and duty class; bay layout against the process line; span per bay; eave against the tallest machine and crane hook height; runway and future-crane provision; cladding and ventilation against process heat; office and mezzanine blocks. The crane items freeze first — everything else hangs from the runway decision.
In detail
Machine foundation positions belong on the checklist even though they are separate designs — the frame grid and the process grid must agree.
Bay spacing moves factory cost 3–7% (Promisteel, 2026) exactly as it does warehouse cost; optimise it against the process line, not the catalogue.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel factory include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page