What drives the cost of a steel factory building most?

Quick answer
In order: crane capacity and duty class, span arrangement, eave height, and cladding specification. The crane alone moves the frame band from $26–42/m² to $36–55/m² FOB (Laotie, 2026), and stepping from 5 t to 32 t of crane capacity adds roughly 25–40 tonnes of steel (Promisteel, 2026). Everything else is refinement; these four are the budget.
In detail
Price the crane decision explicitly — capacity and duty class are two different decisions wearing one name.
Multi-bay layouts are the factory cost lever: internal columns are cheaper than span.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel factory include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.