Guides & how-to · Question / AEO

How to choose a manufacturer in China for a steel structure

Steel building — a steel structure
DESIGN VISUALISATION

Quick answer

Choose a steel structure manufacturer on the evidence buyers actually filter by: verified supplier status, checkable certificates, Trade Assurance, reviews with photographs, a real factory video, and openness to SGS or Bureau Veritas inspection before shipment (supplier-guide research, 2026). Then ask for the document pack — it separates manufacturers from storefronts faster than any factory photograph.

In detail

The document pack is WPS/PQR, welder qualifications, mill certificates and NDT practice — requested before price negotiation, not after deposit.

Match the evidence to your building type: crane, panel and long-span work each have a specialist test elsewhere in this guide set.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel structure include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page