Frame vs Envelope vs Turnkey — Scope Guide

Quick answer
Frame means the steel skeleton: primary and secondary steel, connections and anchor bolts ($25–45/m² FOB). Envelope adds the roof and wall cladding system ($60–90/m²). Turnkey adds doors, ventilation and the accessories package ($90–150/m²) — but never foundations or erection unless the contract says so in words (Laotie price guide, Nov 2026).
The numbers, with their scopes
The JX Steel Structure guide's figures — frame 30–45% of finished cost — explain why scope confusion is so expensive.
Our quotations itemise scope line by line so the comparison is mechanical, not rhetorical.
| Scope | FOB China band | What it includes |
|---|---|---|
| Frame only | $25–45/m² | Primary + secondary steel, connections, anchor bolts |
| Complete envelope | $60–90/m² | Frame + roof & wall cladding, trims, fixings |
| Turnkey package | $90–150/m² | Envelope + doors, ventilation, accessories package |
From guide to quotation
This guide answers the general question — what is included in frame, envelope and turnkey steel building scopes? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.