Guides & how-to · Question / AEO
How to compare quotations for a steel structure without being misled

Quick answer
Compare steel structure quotations by converting every bid to the same basis (FOB, CIF, installed), the same scope (frame, envelope, turnkey) and the same inputs — then compare fingerprints: tonnage, kg/m², grade, coating, document pack (HF Steel quotation guides). The cheapest unlike-for-like number is reliably the most expensive building you will ever buy.
In detail
The full comparison checklist, in table form, is the compare-quotations guide in the price cluster — this page is its short form.
Validity is a comparison line too: a 15-day price and a 90-day price are different risk offers, and the difference is priced somewhere.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel structure include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page