Guides & how-to · Question / AEO

How is a steel structure shipped from China — and in how many containers?

Steel building — a steel structure
DESIGN VISUALISATION

Quick answer

A steel structure ships as labelled bundles in 40 ft containers; the count is a design output — member lengths, nesting and bundle design decide it — so freight belongs in the quotation. Published planning freight to the Middle East runs $3,500–5,500 per container (Promisteel, 2026); sea times run 1–2 weeks to Southeast Asia and 3–5 to Africa.

In detail

Oversize work — very long rafters, space-frame assemblies — routes flat-rack or break-bulk, flagged at design stage and priced in the open.

The shipping and logistics page carries routes, documents and the loading survey in full.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel structure include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page