Guides & how-to · Question / AEO

Design checklist for a steel structure — span, eave, crane, panels, doors

Steel building — a steel structure
DESIGN VISUALISATION

Quick answer

The steel structure design checklist, in the order the decisions price: building type and use; span arrangement or column grid; eave height against the tallest operation; crane capacity and duty class; panel system against climate and temperature duty; door positions against vehicle flow; extension direction. Each item is a cost lever — bay spacing alone moves cost 3–7% (Promisteel, 2026).

In detail

Each building type's own checklist in this guide set reorders these items around what prices that type — crane-led for factories, temperature-led for cold stores, door-led for hangars.

The brief builder is this checklist as a form; the RFQ checklist page is its printable version.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel structure include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page