Price & cost guides · Price / cost intent

Worked Example — a 5,000 m² Warehouse, Priced

Steel building — the building behind the price band
DESIGN VISUALISATION

Quick answer

Take a 5,000 m² warehouse at 28–38 kg/m²: 140–190 tonnes of steel. Frame-only FOB at the published $25–45/m² band gives $125,000–225,000; the complete envelope at $60–90/m² gives $300,000–450,000 (Laotie bands, Nov 2026). Promisteel's real 12,000 m² Dammam case drew steel-package quotes of $62–94/m² — the worked example shows why the spread exists and which lines move it.

The numbers, with their scopes

Line by line, the movers are: span arrangement, bay spacing, cladding system, crane (none here), coating, and container count.

This example is a method demonstration with published bands — your building prices from your drawings.

ScopeFOB China bandWhat it includes
Frame only$125,000–225,0005,000 m² × $25–45
Complete envelope$300,000–450,0005,000 m² × $60–90
Steel weight140–190 t28–38 kg/m²

From guide to quotation

This guide answers the general question — what does a 5,000 m² steel warehouse actually price to, line by line? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.