How to install a steel structure — erection sequence and crew

Quick answer
Steel structure erection follows one grammar everywhere: foundations and anchor survey, columns, primary frames, bracing tensioned before release, secondary steel, envelope, then doors and accessories — bolted, without site welding on kit buildings. Rates run 150–800 m²/day depending on crew size and complexity (JA Steel; Laotie). What varies by type is where the care concentrates.
In detail
Runways are surveyed as machine beds on crane buildings; seals are the quality point on cold stores; the first block is the template on camps — each type page in this set names its own.
HANJI supplies erection drawings with every kit and can place a supervisor on site for the frame stage.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel structure include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page