Price & cost guides · Price / cost intent

What a Proper Quotation Includes

Steel building — the building behind the price band
DESIGN VISUALISATION

Quick answer

A quotation names the design basis (code, loads, steel grades), itemises the scope by line (frame, secondary steel, cladding, doors, accessories), states tonnage and kg/m², names the coating system, the packing and delivery basis, the document pack, the validity and the exclusions. HF Steel's guides make the same point: a quotation is only as good as its inputs and itemisation.

The numbers, with their scopes

If a quotation fits on one line, it is a guess with a currency symbol.

Our quotation checklist page lists the inputs that produce this standard of quote.

ScopeFOB China bandWhat it includes
Design basisCode + loads + gradesNamed
ScopeItemised linesNo bundles
ValidityStated in days15 days standard

From guide to quotation

This guide answers the general question — what should a proper steel structure quotation include? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page