Guides & how-to · Question / AEO
How to reduce the cost of a steel structure without cutting safety

Quick answer
Reduce a steel structure's cost with the levers that survive engineering scrutiny: bay spacing (3–7%), multi-span against clear span (15–30%), crane and eave right-sized, coating matched to the environment class, packing designed to the container (Promisteel, 2026). The list is short because it is honest — every other 'saving' is weight, scope or specification leaving the building quietly.
In detail
Each building type's own page in this set ranks the levers for that type — crane first for factories, temperature first for cold stores, geometry first for hangars.
The reduce-cost price guide works the same levers with figures in table form.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel structure include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page