Price & cost guides · Price / cost intent
Data Centre Shell Cost

Quick answer
Data-centre shells are priced per project: heavy plant decks, large column grids and rapid weathertight programmes make a generic $/m² misleading. What can be stated is the structure of the price — frame and deck package, envelope package, plant structures — and that the buyer is normally a main contractor, not the operator.
The numbers, with their scopes
Gulf campuses at gigawatt scale (Abu Dhabi's Stargate programme) set the context; the export opportunity is the shell package through the contractor.
Fit-out — power, cooling, white space — is a separate specialist market and is never inside a shell price.
| Scope | FOB China band | What it includes |
|---|---|---|
| Shell & core frame | Per project | Frame, decks, stairs |
| Envelope | Per project | Cladding & louvres |
| Plant structures | Per project | Yards, gantries, screens |
From guide to quotation
This guide answers the general question — what does a steel data centre shell cost? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page