Price & cost guides · Price / cost intent

Container & Freight Cost Guide

Steel building — the building behind the price band
DESIGN VISUALISATION

Quick answer

Steel buildings ship as packed bundles in 40 ft containers; a published planning figure for container freight to the Middle East is $3,500–5,500 per container (Promisteel, 2026), varying with season and route. The number of containers is a design output — member lengths, nesting and bundle design decide it — so freight belongs in the quotation, not after it.

The numbers, with their scopes

Sea freight time: 1–2 weeks to Southeast Asia, 2–3 weeks to the Middle East, 3–5 weeks to Africa (JA Steel timeline guide).

Oversize members (very long rafters, space-frame assemblies) may need flat-rack or break-bulk — flagged at design stage, never at the port.

ScopeFOB China bandWhat it includes
Container to Middle East$3,500–5,500Per 40 ft container, planning figure
Sea time — SE Asia1–2 weeksJA Steel
Sea time — Middle East2–3 weeksJA Steel
Sea time — Africa3–5 weeksJA Steel

From guide to quotation

This guide answers the general question — how much does it cost to ship a steel building by container? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.