Price & cost guides · Price / cost intent
Clear-Span Cost Guide — 20 m to 60 m

Quick answer
Span is the strongest price lever in a steel building. Frame FOB bands by span: 20–30 m without crane $30–45/m²; 30–40 m $38–55/m², or $48–70/m² with a 10 t crane; 50–60 m $55–80/m², or $70–100/m² with a 20 t crane (Laotie clear-span guide, 2026). Multi-span layouts undercut clear spans by 15–30% (Promisteel).
The numbers, with their scopes
Every span decision should be priced at two widths: the one requested and the one the operation actually needs.
Haunched tapered frames keep mid-range spans economical; beyond ~40 m, compare space-frame and truss options.
| Scope | FOB China band | What it includes |
|---|---|---|
| 20–30 m, no crane | $30–45/m² | Frame FOB |
| 30–40 m, no crane / 10 t crane | $38–55 / $48–70/m² | Frame FOB |
| 50–60 m, no crane / 20 t crane | $55–80 / $70–100/m² | Frame FOB |
From guide to quotation
This guide answers the general question — how does clear span change a steel building's cost? Your building is a specific one: the calculator turns its dimensions into a first estimate on the same bands and method used above, and the RFQ turns that estimate into an itemised, dated quotation — design basis, scope lines, tonnage and kg/m², validity stated.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.