Type × market · Transactional + local
Cold Storage in Oman

Quick answer
A steel cold storage for Oman prices from the type band — $30–48/m² frame (November 2026) — landed through Sohar / Muscat (ocean freight China→Middle East typically 2–3 weeks). Design basis: Omani standard specifications; GCC customs framework. GCC duty typically 5%.
Why Oman changes the cold storage specification
Climate: Coastal salt exposure at Sohar and Salalah; extreme heat inland.
Industrial cities are being built out under Madayn's 2026–2030 plan — logistics and light-industry buildings are the realistic entry orders.
The building, as specified on the hub
The frame is the easy half of a cold store; the buyer is really buying temperature performance. PIR or mineral-wool panel thickness, vapour control and door specification decide the quotation.
- PIR panels 100–200 mm
- Rapid-roll insulated doors
- Refrigeration plant slab interface
- Blast-freezer cells
Price this building for your port
Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.
Delivery & documents
Route: fabrication in Cangzhou → container packing in erection sequence → Sohar / Muscat. Document pack: drawings and calculations to the code above, mill certificates (EN 10204 3.1), welding and inspection records, packing list — plus the destination conformity route described on the Oman market page.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Do you ship to Oman?
Yes — Sohar / Muscat: ocean freight China→Middle East typically 2–3 weeks. GCC duty typically 5%.
What does the price for a cold storage building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page