Guides & how-to · Question / AEO
What drives cold storage building cost beyond the steel frame?

Quick answer
Panel core and thickness, vapour sealing, door count and type, floor insulation and refrigeration interface. The frame of a cold store prices like a warehouse; the temperature performance is the building. Two cold stores on identical frames can differ by half in cost on panel specification — which is why cold-storage quotations are built from temperature spec, not floor plan.
In detail
State operating temperature and door traffic in the enquiry; both size the panel and door budget.
Refrigeration plant is normally a separate specialist package — confirm its boundary in every quotation.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a cold storage building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page