Guides & how-to · Question / AEO

How is a cold storage building shipped from China — and in how many containers?

Steel building — a cold storage building
DESIGN VISUALISATION

Quick answer

A cold storage building ships in two cargoes that happen to share containers: steel bundles, packed dense and heavy, and panel packs — light, bulky and damage-sensitive, which travel flat, protected and in wall order. Panel volume, not steel weight, usually sets the container count; the packing plan is written at fabrication stage for both.

In detail

Insulated doors ship as finished units with their frames — count them as cargo, not as steel.

Sea times run by region (JA Steel): 1–2 weeks Southeast Asia, 2–3 Middle East, 3–5 Africa; panels should not wait on a hot dock, so the erection sequence and the sailing are planned together.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a cold storage building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page